Upcoming* NOVA Improvements: Earlier this summer, the Minnesota Public Utilities Commission approved revised templates for the Simplified and Standard Interconnection Applications. While these templates are not required and do not change the MN DIP, NOVA Power Portal is being updated to align with these templates by clarifying application questions and simplifying input data fields, which includes removing current redundant inputs. For more information and to view copies of the revised templates, visit the MN PUC web site: mn.gov/puc/activities/economic-analysis/distributed-energy/interconnections/
*These NOVA Power Portal updates will be implemented by the end of 2021.

Distributed Energy Resource Document Library

Browse interconnection resource documents or download a PDF application.

Current Application Queue

APP ID Queue # Qualify Date Process Status DER Type and Size Sub - Fdr - Phs
APP1420 1 8/27/2019 8:49:28 AM Simplified Interconnected Solar Photovoltaic 6.96 kW 7 - 1 - C
APP2388 2 12/11/2019 8:21:24 PM Simplified Interconnected Solar Photovoltaic 15.00 kW 4 - 4 - C
APP2850 3 2/12/2020 9:17:03 AM Simplified Interconnected Solar Photovoltaic 8.06 kW 12 - 2 - C
APP3123 4 5/13/2020 8:53:51 AM Simplified Interconnected Solar Photovoltaic 13.92 kW 11 - 4 - B
APP3361 5 7/24/2020 5:23:09 PM Fast Track Interconnected Solar Photovoltaic 39.82 kW 11 - 1 - A
APP3617 6 10/15/2020 2:06:32 PM Fast Track Interconnected Solar Photovoltaic 24.00 kW 6 - 3 - C
APP3878 7 11/11/2020 10:08:44 AM Simplified Interconnected Solar Photovoltaic 7.60 kW 11 - 4 - A
APP3867 8 11/25/2020 8:31:49 AM Simplified Interconnected Solar Photovoltaic 10.00 kW 11 - 4 - A
APP4195 9 3/17/2021 9:53:57 AM Simplified Interconnected Solar Photovoltaic 16.00 kW 12 - 2 - B
APP4582 10 9/14/2021 12:01:40 PM Fast Track Pending Engineer Review Solar Photovoltaic 23.40 kW 10 - 4 - A

 

 