Upcoming* NOVA Improvements: Earlier this summer, the Minnesota Public Utilities Commission approved revised templates for the Simplified and Standard Interconnection Applications. While these templates are not required and do not change the MN DIP, NOVA Power Portal is being updated to align with these templates by clarifying application questions and simplifying input data fields, which includes removing current redundant inputs. For more information and to view copies of the revised templates, visit the MN PUC web site: mn.gov/puc/activities/economic-analysis/distributed-energy/interconnections/
*These NOVA Power Portal updates will be implemented by the end of 2021.

Distributed Energy Resource Document Library

Browse interconnection resource documents or download a PDF application.

Current Application Queue

APP ID Queue # Qualify Date Process Status DER Type and Size Sub - Fdr - Phs
APP2137 1 9/6/2019 2:18:20 PM Simplified Interconnected Solar Photovoltaic 7.60 kW 21 - 1 - C
APP2611 2 11/18/2019 2:35:36 PM Simplified Interconnected Solar Photovoltaic 6.00 kW 24 - 2 - B
APP2766 3 8/26/2020 12:11:13 PM Fast Track DER Installation and Interconnection Solar Photovoltaic 38.35 kW 17 - 2 - AC
APP3910 4 11/12/2020 10:18:57 PM Simplified DER Installation and Interconnection Solar Photovoltaic 7.60 kW 16 - 4 - A
APP3836 5 11/22/2020 8:55:20 AM Fast Track DER Installation and Interconnection Solar Photovoltaic 24.00 kW 17 - 4 - C
APP3990 6 12/10/2020 7:29:14 PM Simplified DER Installation and Interconnection Solar Photovoltaic 5.00 kW 6 - 1 - C
APP4066 7 2/10/2021 11:24:16 AM Simplified DER Installation and Interconnection Solar Photovoltaic 5.00 kW 6 - 3 - C
APP4498 8 4/27/2021 8:12:15 PM Fast Track Interconnected Solar Photovoltaic 36.00 kW 17 - 4 - C
APP4529 9 6/4/2021 10:51:27 AM Fast Track DER Installation and Interconnection Solar Photovoltaic 39.00 kW 15 - 1 - A
APP4780 10 7/15/2021 9:10:01 AM Fast Track DER Installation and Interconnection Solar Photovoltaic 23.04 kW 15 - 2 - A
APP4807 11 8/10/2021 11:36:35 AM Simplified DER Installation and Interconnection Solar Photovoltaic 7.60 kW 18 - 1 - B
APP5189 12 10/6/2021 3:45:00 PM Fast Track Pending Contract (Utility) Solar Photovoltaic 30.72 kW 15 - 2 - BC

 

 

  © 2021 - Application developed and maintained by STAR Energy Services LLC