APP ID | Queue # | Qualify Date | Process | Status | DER Type and Size | Sub - Fdr - Phs |
---|---|---|---|---|---|---|
APP4764 | 1 | 9/2/2021 8:35:05 AM | Simplified | DER Installation and Interconnection | Solar PV 7.600 kW | 19 - 04 - B |
APP5485 | 2 | 12/23/2021 5:58:54 PM | Simplified | DER Installation and Interconnection | Solar PV 3.770 kW | 25 - 06 - C |
APP5532 | 3 | 12/31/2021 11:55:27 AM | Simplified | DER Installation and Interconnection | Solar PV 19.720 kW | 2 - 01 - C |
APP5521 | 4 | 12/31/2021 8:53:33 PM | Fast Track | DER Installation and Interconnection | Solar PV 26.600 kW | 15 - 01 - B |
APP5563 | 5 | 1/18/2022 11:40:43 AM | Simplified | DER Installation and Interconnection | Solar PV 7.600 kW | 28 - 01 - B |
APP5842 | 6 | 4/14/2022 5:03:44 PM | Simplified | DER Installation and Interconnection | Solar PV 9.772 kW | 17 - 05 - B |
APP6010 | 7 | 5/18/2022 1:51:34 PM | Simplified | DER Installation and Interconnection | Solar PV 11.520 kW | 16 - 02 - B |
APP6063 | 8 | 5/24/2022 10:08:44 PM | Simplified | DER Installation and Interconnection | Solar PV 7.600 kW | 22 - 06 - B |
APP6131 | 9 | 7/6/2022 11:45:50 AM | Simplified | DER Installation and Interconnection | Solar PV 7.830 kW | 27 - 04 - B |
APP6397 | 10 | 7/15/2022 2:42:01 PM | Simplified | DER Installation and Interconnection | Solar PV 10.470 kW | 32 - 04 - B |
APP6344 | 11 | 7/26/2022 11:24:17 AM | Simplified | DER Installation and Interconnection | Solar PV 6.380 kW | 21 - 01 - B |
APP6494 | 12 | 8/3/2022 10:59:52 AM | Simplified | DER Installation and Interconnection | Solar PV 9.280 kW | 17 - 05 - C |
APP6505 | 13 | 8/4/2022 12:12:49 PM | Simplified | DER Installation and Interconnection | Solar PV 6.380 kW | 22 - 06 - B |
APP6346 | 14 | 8/7/2022 9:24:08 AM | Simplified | DER Installation and Interconnection | Solar PV 4.930 kW | 9 - 07 - A |
APP6374 | 15 | 8/9/2022 8:18:51 AM | Simplified | DER Installation and Interconnection | Solar PV 9.860 kW | 7 - 01 - A |
APP6310 | 16 | 8/9/2022 10:06:17 AM | Simplified | DER Installation and Interconnection | Solar PV 8.410 kW | 19 - 03 - A |
APP6463 | 17 | 8/9/2022 10:52:16 AM | Simplified | Inspection and Testing | Solar PV 2.500 kW | 5 - 02 - B |
APP6559 | 18 | 8/22/2022 7:00:28 PM | Simplified | Pending Contract (Customer) | Solar PV 4.188 kW | 9 - 02 - C |
APP6636 | 19 | 8/23/2022 2:50:44 PM | Simplified | DER Installation and Interconnection | Solar PV 5.800 kW | 11 - 11 - A |
APP6582 | 20 | 8/30/2022 3:54:16 PM | Fast Track | DER Installation and Interconnection | Solar PV 27.000 kW | 4 - 04 - A |
APP6720 | 21 | 9/7/2022 9:58:47 PM | Simplified | DER Installation and Interconnection | Solar PV 9.570 kW | 9 - 10 - C |
APP6552 | 22 | 9/14/2022 10:39:00 AM | Fast Track | DER Installation and Interconnection | Solar PV 40.000 kW | 17 - 03 - ABC |
APP6848 | 23 | 9/21/2022 8:50:54 PM | Simplified | Inspection and Testing | Solar PV 8.960 kW | 27 - 04 - A |
APP6878 | 24 | 9/26/2022 2:07:39 PM | Simplified | DER Installation and Interconnection | Solar PV 5.040 kW | 22 - 07 - A |
APP6814 | 25 | 9/26/2022 2:47:17 PM | Fast Track | DER Installation and Interconnection | Solar PV 4500.000 kW | 30 - 01 - ABC |
APP6866 | 26 | 9/27/2022 7:59:11 PM | Simplified | DER Installation and Interconnection | Solar PV 14.210 kW | 16 - 06 - C |
APP6891 | 27 | 9/28/2022 10:31:12 PM | Simplified | DER Installation and Interconnection | Solar PV 7.830 kW | 24 - 06 - A |
APP6900 | 28 | 9/29/2022 3:34:06 PM | Simplified | DER Installation and Interconnection | Solar PV 12.564 kW | 5 - 03 - B |
APP6419 | 29 | 10/4/2022 1:27:51 PM | Simplified | DER Installation and Interconnection | Solar PV 6.960 kW | 11 - 11 - B |
APP6680 | 30 | 10/7/2022 10:07:26 PM | Simplified | DER Installation and Interconnection | Solar PV 6.500 kW | 17 - 02 - A |
APP6855 | 31 | 10/10/2022 10:34:44 AM | Fast Track | DER Installation and Interconnection | Solar PV 20.010 kW | 28 - 03 - B |
APP6360 | 32 | 10/10/2022 2:56:32 PM | Simplified | DER Installation and Interconnection | Solar PV 8.410 kW | 25 - 03 - B |
APP6453 | 33 | 10/13/2022 11:32:45 AM | Simplified | DER Installation and Interconnection | Solar PV 8.410 kW | 6 - 04 - C |
APP6943 | 34 | 10/14/2022 1:33:18 PM | Simplified | DER Installation and Interconnection | Solar PV 5.220 kW | 5 - 03 - C |
APP6844 | 35 | 10/15/2022 11:29:42 AM | Simplified | DER Installation and Interconnection | Solar PV 5.510 kW | 11 - 11 - C |
APP6564 | 36 | 10/17/2022 10:12:35 AM | Simplified | DER Installation and Interconnection | Solar PV 12.760 kW | 7 - 04 - A |
APP6449 | 37 | 10/20/2022 2:46:28 PM | Simplified | Inspection and Testing | Solar PV 14.790 kW | 21 - 02 - C |
APP6815 | 38 | 10/21/2022 12:49:26 PM | Fast Track | DER Installation and Interconnection | Solar PV 20.880 kW | 5 - 10 - B |
APP6821 | 39 | 10/21/2022 4:19:45 PM | Simplified | DER Installation and Interconnection | Solar PV 10.000 kW | 10 - 06 - C |
APP6608 | 40 | 10/21/2022 5:02:20 PM | Simplified | Inspection and Testing | Solar PV 7.600 kW | 22 - 03 - B |
APP6978 | 41 | 10/26/2022 12:06:45 PM | Simplified | DER Installation and Interconnection | Solar PV 6.960 kW | 9 - 03 - A |
APP6826 | 42 | 10/28/2022 3:15:51 PM | Fast Track | DER Installation and Interconnection | Solar PV 24.070 kW | 15 - 01 - B |
APP7085 | 43 | 11/1/2022 10:44:12 AM | Simplified | Inspection and Testing | Solar PV 6.400 kW | 25 - 04 - B |
APP7016 | 44 | 11/3/2022 3:41:39 PM | Simplified | DER Installation and Interconnection | Solar PV 6.670 kW | 27 - 04 - B |
APP7055 | 45 | 11/4/2022 12:39:32 PM | Simplified | DER Installation and Interconnection | Solar PV 5.605 kW | 20 - 06 - A |
APP7028 | 46 | 11/8/2022 12:34:26 PM | Simplified | DER Installation and Interconnection | Solar PV 8.320 kW | 25 - 01 - C |
APP7122 | 47 | 11/8/2022 1:10:45 PM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 22 - 05 - B |
APP7127 | 48 | 11/9/2022 10:48:52 AM | Simplified | Inspection and Testing | Solar PV 7.250 kW | 22 - 06 - C |
APP6716 | 49 | 11/10/2022 1:31:57 PM | Fast Track | DER Installation and Interconnection | Solar PV 26.100 kW | 15 - 01 - A |
APP7100 | 50 | 11/10/2022 4:26:18 PM | Simplified | Inspection and Testing | Solar PV 6.670 kW | 22 - 03 - C |
APP7149 | 51 | 11/12/2022 8:17:11 AM | Simplified | Inspection and Testing | Solar PV 6.380 kW | 32 - 04 - C |
APP7101 | 52 | 11/16/2022 6:47:58 AM | Simplified | DER Installation and Interconnection | Solar PV 7.250 kW | 6 - 04 - A |
APP7173 | 53 | 11/16/2022 5:10:52 PM | Fast Track | DER Installation and Interconnection | Solar PV 15.200 kW | 8 - 01 - C |
APP7187 | 54 | 11/18/2022 7:15:19 AM | Simplified | DER Installation and Interconnection | Solar PV 9.600 kW | 5 - 11 - B |
APP7153 | 55 | 11/25/2022 4:24:51 PM | Simplified | DER Installation and Interconnection | Solar PV 11.600 kW | 27 - 04 - A |
APP7224 | 56 | 11/29/2022 7:42:44 PM | Simplified | DER Installation and Interconnection | Solar PV 6.400 kW | 18 - 01 - B |
APP7231 | 57 | 12/1/2022 6:40:11 PM | Simplified | Inspection and Testing | Solar PV 4.480 kW | 3 - 01 - A |
APP7248 | 58 | 12/5/2022 4:03:51 PM | Simplified | DER Installation and Interconnection | Solar PV 18.850 kW | 13 - 01 - A |
APP7230 | 59 | 12/8/2022 3:54:30 PM | Simplified | DER Installation and Interconnection | Solar PV 11.600 kW | 21 - 02 - C |
APP7293 | 60 | 12/9/2022 3:35:30 PM | Simplified | DER Installation and Interconnection | Solar PV 7.680 kW | 19 - 04 - C |
APP7288 | 61 | 12/9/2022 5:39:28 PM | Simplified | Inspection and Testing | Solar PV 6.960 kW | 24 - 06 - A |
APP7307 | 62 | 12/12/2022 4:44:49 PM | Simplified | Inspection and Testing | Solar PV 4.930 kW | 5 - 01 - A |
APP7309 | 63 | 12/12/2022 5:30:12 PM | Simplified | Inspection and Testing | Solar PV 5.800 kW | 22 - 04 - B |
APP7311 | 64 | 12/12/2022 5:44:23 PM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 24 - 06 - A |
APP7322 | 65 | 12/12/2022 10:35:28 PM | Simplified | Inspection and Testing | Solar PV 7.540 kW | 21 - 02 - A |
APP7315 | 66 | 12/13/2022 2:12:45 AM | Simplified | Inspection and Testing | Solar PV 5.510 kW | 5 - 08 - B |
APP7325 | 67 | 12/13/2022 7:43:56 AM | Simplified | Inspection and Testing | Solar PV 4.060 kW | 27 - 04 - A |
APP7324 | 68 | 12/13/2022 9:12:22 AM | Simplified | Inspection and Testing | Solar PV 9.570 kW | 21 - 02 - C |
APP7319 | 69 | 12/13/2022 1:33:28 PM | Simplified | DER Installation and Interconnection | Solar PV 7.250 kW | 25 - 01 - A |
APP7323 | 70 | 12/13/2022 5:10:36 PM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 22 - 04 - B |
APP7310 | 71 | 12/13/2022 9:59:00 PM | Simplified | Inspection and Testing | Solar PV 4.060 kW | 26 - 02 - A |
APP7320 | 72 | 12/14/2022 9:45:15 AM | Simplified | DER Installation and Interconnection | Solar PV 6.380 kW | 8 - 05 - A |
APP7306 | 73 | 12/14/2022 10:06:52 AM | Simplified | DER Installation and Interconnection | Solar PV 4.060 kW | 5 - 11 - C |
APP7317 | 74 | 12/14/2022 11:35:14 AM | Simplified | Inspection and Testing | Solar PV 6.090 kW | 9 - 04 - A |
APP7125 | 75 | 12/14/2022 11:56:19 AM | Simplified | Inspection and Testing | Solar PV 6.380 kW | 8 - 04 - B |
APP7339 | 76 | 12/14/2022 12:08:46 PM | Simplified | DER Installation and Interconnection | Solar PV 12.160 kW | 7 - 04 - A |
APP7326 | 77 | 12/14/2022 12:26:20 PM | Simplified | Inspection and Testing | Solar PV 4.930 kW | 22 - 07 - B |
APP7290 | 78 | 12/14/2022 12:43:07 PM | Simplified | Inspection and Testing | Solar PV 8.700 kW | 8 - 04 - C |
APP7303 | 79 | 12/14/2022 4:57:13 PM | Fast Track | DER Installation and Interconnection | Solar PV 21.750 kW | 3 - 02 - A |
APP7287 | 80 | 12/15/2022 3:47:42 PM | Simplified | Pending Contract (Customer) | Solar PV 6.090 kW | 11 - 01 - B |
APP7190 | 81 | 12/15/2022 6:57:11 PM | Simplified | DER Installation and Interconnection | Solar PV 15.000 kW | 32 - 04 - A |
APP7313 | 82 | 12/16/2022 8:56:55 AM | Simplified | DER Installation and Interconnection | Solar PV 5.220 kW | 25 - 03 - A |
APP7318 | 83 | 12/16/2022 10:45:31 AM | Simplified | Inspection and Testing | Solar PV 5.800 kW | 26 - 02 - C |
APP7347 | 84 | 12/16/2022 5:36:42 PM | Simplified | DER Installation and Interconnection | Solar PV 4.800 kW | 22 - 07 - A |
APP7354 | 85 | 12/18/2022 7:06:49 PM | Simplified | Pending Contract (Customer) | Solar PV 4.350 kW | 25 - 05 - B |
APP7355 | 86 | 12/18/2022 9:32:57 PM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 22 - 07 - A |
APP7353 | 87 | 12/19/2022 6:27:10 PM | Simplified | DER Installation and Interconnection | Solar PV 10.440 kW | 25 - 04 - B |
APP7267 | 88 | 12/19/2022 8:57:17 PM | Fast Track | DER Installation and Interconnection | Solar PV 38.280 kW | 29 - 01 - A |
APP7267 | 89 | 12/19/2022 8:57:17 PM | Fast Track | DER Installation and Interconnection | Solar PV 38.280 kW | 29 - 01 - A |
APP7321 | 90 | 12/20/2022 1:15:16 PM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 21 - 03 - C |
APP7374 | 91 | 12/20/2022 1:54:19 PM | Simplified | Inspection and Testing | Solar PV 5.800 kW | 22 - 07 - A |
APP7124 | 92 | 12/20/2022 8:21:33 PM | Simplified | DER Installation and Interconnection | Solar PV 3.190 kW | 9 - 10 - B |
APP7093 | 93 | 12/27/2022 2:05:43 PM | Fast Track | DER Installation and Interconnection | Solar PV 23.034 kW | 9 - 08 - B |
APP7405 | 94 | 12/30/2022 3:26:43 PM | Simplified | DER Installation and Interconnection | Solar PV 7.830 kW | 25 - 01 - C |
APP7384 | 95 | 1/6/2023 4:35:30 PM | Simplified | DER Installation and Interconnection | Solar PV 5.800 kW | 5 - 02 - B |
APP7415 | 96 | 1/6/2023 9:46:36 PM | Simplified | DER Installation and Interconnection | Solar PV 13.760 kW | 11 - 04 - C |
APP7126 | 97 | 1/7/2023 9:36:06 AM | Simplified | Inspection and Testing | Solar PV 4.640 kW | 17 - 05 - C |
APP6765 | 98 | 1/8/2023 10:12:18 PM | Simplified | DER Installation and Interconnection | Solar PV 19.546 kW | 3 - 01 - B |
APP7239 | 99 | 1/13/2023 1:04:01 PM | Simplified | DER Installation and Interconnection | Solar PV 8.960 kW | 16 - 03 - C |
APP7413 | 100 | 1/14/2023 8:29:35 AM | Simplified | DER Installation and Interconnection | Solar PV 3.480 kW | 5 - 06 - B |
APP7427 | 101 | 1/16/2023 3:24:04 PM | Simplified | DER Installation and Interconnection | Solar PV 5.584 kW | 22 - 07 - B |
APP7371 | 102 | 1/16/2023 5:16:51 PM | Simplified | DER Installation and Interconnection | Solar PV 10.150 kW | 17 - 01 - A |
APP6977 | 103 | 1/19/2023 10:38:42 PM | Simplified | DER Installation and Interconnection | Solar PV 6.380 kW | 16 - 01 - B |
APP7197 | 104 | 1/26/2023 10:23:42 PM | Simplified | Pending Contract (Customer) | Solar PV 14.500 kW | 17 - 05 - B |
APP7469 | 105 | 1/27/2023 12:40:35 PM | Simplified | DER Installation and Interconnection | Solar PV 3.770 kW | 25 - 01 - A |
APP7474 | 106 | 1/30/2023 12:07:04 PM | Simplified | DER Installation and Interconnection | Solar PV 15.950 kW | 22 - 04 - B |
APP7485 | 107 | 2/2/2023 1:17:49 PM | Simplified | DER Installation and Interconnection | Solar PV 5.200 kW | 21 - 02 - B |
APP7492 | 108 | 2/6/2023 6:59:22 PM | Simplified | Inspection and Testing | Solar PV 10.000 kW | 20 - 04 - C |
APP7473 | 109 | 2/7/2023 3:48:44 PM | Simplified | DER Installation and Interconnection | Solar PV 11.400 kW | 25 - 03 - B |
APP7502 | 110 | 2/9/2023 2:51:19 PM | Simplified | Inspection and Testing | Solar PV 4.350 kW | 16 - 02 - B |
APP7488 | 111 | 2/10/2023 10:01:21 AM | Simplified | DER Installation and Interconnection | Solar PV 16.000 kW | 18 - 01 - C |
APP7509 | 112 | 2/11/2023 7:59:23 AM | Simplified | DER Installation and Interconnection | Solar PV 6.670 kW | 6 - 03 - A |
APP7416 | 113 | 2/17/2023 10:05:55 AM | Simplified | DER Installation and Interconnection | Solar PV 6.380 kW | 17 - 03 - C |
APP7537 | 114 | 2/17/2023 7:43:01 PM | Simplified | DER Installation and Interconnection | Solar PV 4.930 kW | 22 - 07 - C |
APP7542 | 115 | 2/19/2023 10:37:01 AM | Simplified | DER Installation and Interconnection | Solar PV 2.320 kW | 22 - 04 - B |
APP7399 | 116 | 2/20/2023 1:28:34 PM | Simplified | Pending Contract (Customer) | Solar PV 8.960 kW | 5 - 03 - B |
APP7549 | 117 | 2/21/2023 3:52:36 PM | Simplified | DER Installation and Interconnection | Solar PV 20.000 kW | 2 - 02 - A |
APP7552 | 118 | 2/22/2023 1:16:44 PM | Simplified | DER Installation and Interconnection | Solar PV 6.960 kW | 5 - 11 - A |
APP7580 | 119 | 3/2/2023 9:55:36 AM | Simplified | DER Installation and Interconnection | Solar PV 7.800 kW | 19 - 02 - C |
APP7562 | 120 | 3/2/2023 6:38:07 PM | Simplified | Pending Contract (Customer) | Solar PV 5.220 kW | 10 - 03 - B |
APP7577 | 121 | 3/3/2023 6:29:09 PM | Simplified | DER Installation and Interconnection | Solar PV 11.600 kW | 28 - 01 - C |
APP7554 | 122 | 3/8/2023 1:01:17 PM | Simplified | DER Installation and Interconnection | Solar PV 12.913 kW | 15 - 03 - A |
APP7557 | 123 | 3/9/2023 9:19:49 AM | Simplified | Pending Contract (Customer) | Solar PV 10.710 kW | 11 - 06 - B |
APP7568 | 124 | 3/9/2023 4:07:16 PM | Simplified | DER Installation and Interconnection | Solar PV 8.320 kW | 9 - 05 - B |
APP7361 | 125 | 3/9/2023 8:48:50 PM | Simplified | DER Installation and Interconnection | Solar PV 7.600 kW | 21 - 04 - C |
APP7585 | 126 | 3/10/2023 3:08:10 PM | Simplified | Pending Engineer Review | Solar PV 7.800 kW | 18 - 01 - C |
APP7593 | 127 | 3/11/2023 12:17:42 PM | Simplified | Pending Contract (Customer) | Solar PV 4.060 kW | 22 - 04 - B |
APP7606 | 128 | 3/12/2023 11:47:59 AM | Simplified | Pending Engineer Review | Solar PV 13.800 kW | 8 - 02 - B |
APP7583 | 129 | 3/12/2023 1:31:30 PM | Simplified | Pending Engineer Review | Solar PV 2.600 kW | 5 - 11 - C |
APP7608 | 130 | 3/13/2023 11:52:16 AM | Simplified | Pending Contract (Customer) | Solar PV 13.920 kW | 9 - 02 - A |
APP7378 | 131 | 3/15/2023 4:10:01 PM | Simplified | DER Installation and Interconnection | Solar PV 4.350 kW | 11 - 09 - A |
APP7640 | 132 | 3/17/2023 12:13:04 PM | Simplified | Pending Engineer Review | Solar PV 4.640 kW | 25 - 06 - B |
APP7645 | 133 | 3/20/2023 9:10:35 PM | Simplified | Pending Engineer Review | Solar PV 7.830 kW | 16 - 03 - A |
APP7654 | 134 | 3/22/2023 4:02:48 PM | Simplified | Pending Initial Review | Solar PV 6.400 kW | - - |
APP7240 | 135 | 3/23/2023 8:51:56 AM | Simplified | Pending Initial Review | Solar PV 6.000 kW | - - |
APP7650 | 136 | 3/23/2023 1:09:37 PM | Fast Track | Pending Initial Review | Wind 25.000 kW | - - |
APP7668 | 137 | 3/25/2023 4:34:24 PM | Simplified | Pending Initial Review | Solar PV 3.770 kW | - - |
APP7669 | 138 | 3/27/2023 10:42:45 AM | Simplified | Pending Initial Review | Solar PV 3.190 kW | - - |
APP4875 | 0 | 5/19/2022 3:06:31 PM | Simplified | Interconnected | Solar PV 14.000 kW | 24 - 02 - C |
APP5343 | 0 | 11/17/2021 3:00:37 PM | Simplified | Interconnected | Solar PV 13.920 kW | 4 - 04 - C |
APP5476 | 0 | 12/24/2021 7:20:05 PM | Simplified | Interconnected | Solar PV 8.410 kW | 18 - 02 - A |
APP5524 | 0 | 12/29/2021 4:52:15 PM | Simplified | Interconnected | Solar PV 5.800 kW | 15 - 04 - A |
APP5856 | 0 | 6/17/2022 8:15:41 AM | Fast Track | Interconnected | Solar PV 23.100 kW | 3 - 02 - A |
APP6035 | 0 | 9/21/2022 12:49:54 AM | Simplified | Interconnected | Solar PV 13.920 kW | 2 - 04 - C |
APP6062 | 0 | 8/1/2022 10:31:28 AM | Simplified | Interconnected | Solar PV 12.760 kW | 16 - 04 - A |
APP6198 | 0 | 8/3/2022 2:30:05 PM | Simplified | Interconnected | Solar PV 6.090 kW | 12 - 02 - C |
APP6199 | 0 | 8/25/2022 10:12:33 AM | Simplified | Interconnected | Solar PV 8.700 kW | 22 - 03 - C |
APP6221 | 0 | 6/23/2022 1:58:30 PM | Simplified | Interconnected | Solar PV 5.000 kW | 9 - 04 - B |
APP6288 | 0 | 8/12/2022 10:04:55 AM | Simplified | Interconnected | Solar PV 10.440 kW | 27 - 05 - A |
APP6294 | 0 | 7/25/2022 12:25:23 PM | Simplified | Interconnected | Solar PV 13.920 kW | 8 - 06 - C |
APP6441 | 0 | 9/2/2022 4:44:04 PM | Simplified | Interconnected | Solar PV 15.200 kW | 26 - 04 - B |
APP6571 | 0 | 8/22/2022 12:36:14 PM | Simplified | Interconnected | Solar PV 7.250 kW | 15 - 01 - B |
APP6580 | 0 | 9/8/2022 4:01:37 PM | Simplified | Interconnected | Solar PV 11.600 kW | 11 - 09 - A |
APP6635 | 0 | 8/23/2022 9:07:00 AM | Simplified | Interconnected | Solar PV 8.027 kW | 13 - 04 - A |
APP6728 | 0 | 10/11/2022 10:59:50 AM | Simplified | Interconnected | Solar PV 5.800 kW | 5 - 01 - C |
APP6754 | 0 | 10/25/2022 11:58:59 AM | Simplified | Interconnected | Solar PV 8.120 kW | 25 - 01 - A |
APP6763 | 0 | 9/23/2022 9:50:31 PM | Simplified | Interconnected | Solar PV 12.040 kW | 25 - 03 - C |
APP6845 | 0 | 9/22/2022 8:30:27 AM | Simplified | Interconnected | Solar PV 6.960 kW | 19 - 04 - A |
APP6857 | 0 | 9/25/2022 10:26:31 PM | Simplified | Interconnected | Solar PV 3.840 kW | 14 - 03 - C |
APP6867 | 0 | 10/4/2022 10:40:43 AM | Simplified | Interconnected | Solar PV 3.840 kW | 14 - 03 - B |
APP6870 | 0 | 9/23/2022 7:03:58 PM | Simplified | Interconnected | Solar PV 7.680 kW | 25 - 03 - B |
APP6884 | 0 | 9/27/2022 4:42:44 PM | Simplified | Interconnected | Solar PV 3.900 kW | 22 - 01 - B |
APP6886 | 0 | 10/5/2022 3:14:21 PM | Simplified | Interconnected | Solar PV 10.000 kW | 11 - 11 - A |
APP6893 | 0 | 10/14/2022 3:43:54 PM | Simplified | Interconnected | Solar PV 13.920 kW | 9 - 04 - C |
APP6927 | 0 | 10/13/2022 6:24:45 AM | Simplified | Interconnected | Solar PV 8.960 kW | 22 - 05 - A |
APP6931 | 0 | 10/4/2022 7:32:50 PM | Simplified | Interconnected | Solar PV 6.282 kW | 6 - 02 - C |
APP6959 | 0 | 10/24/2022 5:24:11 PM | Simplified | Interconnected | Solar PV 6.960 kW | 20 - 06 - A |
APP6966 | 0 | 10/20/2022 12:19:53 PM | Simplified | Interconnected | Solar PV 9.570 kW | 10 - 07 - A |
APP6985 | 0 | 10/28/2022 9:59:13 AM | Simplified | Interconnected | Solar PV 7.250 kW | 22 - 08 - C |
APP6987 | 0 | 10/13/2022 4:02:47 PM | Simplified | Interconnected | Solar PV 3.480 kW | 17 - 03 - C |
APP7003 | 0 | 10/17/2022 3:42:55 PM | Simplified | Interconnected | Solar PV 16.000 kW | 5 - 02 - B |
APP7012 | 0 | 11/2/2022 3:24:18 PM | Simplified | Interconnected | Solar PV 4.932 kW | 5 - 08 - B |
APP7048 | 0 | 10/28/2022 2:20:34 PM | Simplified | Interconnected | Solar PV 7.040 kW | 10 - 03 - A |
APP7058 | 0 | 11/21/2022 12:09:57 PM | Simplified | Interconnected | Solar PV 11.400 kW | 25 - 04 - C |
APP7073 | 0 | 10/28/2022 9:19:39 AM | Simplified | Interconnected | Solar PV 13.800 kW | 25 - 04 - C |
APP7074 | 0 | 10/28/2022 11:30:13 AM | Simplified | Interconnected | Solar PV 8.120 kW | 11 - 04 - A |
APP7078 | 0 | 10/31/2022 2:13:41 PM | Simplified | Interconnected | Solar PV 10.150 kW | 5 - 01 - B |
APP7084 | 0 | 11/1/2022 9:36:11 AM | Simplified | Interconnected | Solar PV 7.040 kW | 22 - 07 - A |
APP7107 | 0 | 11/5/2022 10:06:27 AM | Simplified | Interconnected | Solar PV 6.380 kW | 11 - 08 - C |
APP7119 | 0 | 11/29/2022 1:26:46 PM | Simplified | Interconnected | Solar PV 13.920 kW | 19 - 05 - B |
APP7121 | 0 | 11/8/2022 4:10:16 PM | Simplified | Interconnected | Solar PV 3.770 kW | 19 - 04 - A |
APP7112 | 0 | 11/14/2022 1:05:01 PM | Simplified | Interconnected | Solar PV 10.240 kW | 18 - 01 - A |
APP7157 | 0 | 11/25/2022 10:04:58 AM | Simplified | Interconnected | Solar PV 7.680 kW | 3 - 01 - A |
APP7160 | 0 | 11/14/2022 9:18:51 PM | Simplified | Interconnected | Solar PV 5.120 kW | 18 - 01 - C |
APP7164 | 0 | 11/21/2022 4:18:23 PM | Simplified | Interconnected | Solar PV 16.820 kW | 15 - 01 - C |
APP7168 | 0 | 11/16/2022 7:51:28 AM | Simplified | Interconnected | Solar PV 3.480 kW | 9 - 02 - C |
APP7189 | 0 | 1/4/2023 8:57:00 AM | Simplified | Interconnected | Solar PV 6.980 kW | 5 - 03 - B |
APP7202 | 0 | 11/22/2022 12:20:29 PM | Fast Track | Interconnected | Solar PV 34.200 kW | 7 - 03 - B |
APP7232 | 0 | 12/1/2022 8:24:30 AM | Simplified | Interconnected | Solar PV 6.000 kW | 25 - 06 - A |
APP7261 | 0 | 12/7/2022 4:29:52 PM | Simplified | Interconnected | Solar PV 7.540 kW | 21 - 01 - B |
APP7269 | 0 | 12/9/2022 8:30:09 PM | Simplified | Interconnected | Solar PV 6.380 kW | 16 - 04 - A |
APP7289 | 0 | 12/9/2022 1:11:09 PM | Simplified | Interconnected | Solar PV 6.960 kW | 16 - 04 - A |
APP7291 | 0 | 12/9/2022 2:41:41 PM | Simplified | Interconnected | Solar PV 4.640 kW | 22 - 04 - B |
APP7308 | 0 | 12/12/2022 3:04:41 PM | Simplified | Interconnected | Solar PV 5.220 kW | 11 - 09 - A |
APP7327 | 0 | 12/13/2022 3:20:29 PM | Simplified | Interconnected | Solar PV 12.180 kW | 13 - 08 - C |
APP7338 | 0 | 12/15/2022 10:22:12 AM | Simplified | Interconnected | Solar PV 8.120 kW | 17 - 03 - C |
APP7345 | 0 | 12/14/2022 4:58:53 PM | Simplified | Interconnected | Solar PV 6.380 kW | 16 - 03 - A |
APP7453 | 0 | 1/19/2023 11:37:47 AM | Simplified | Interconnected | Solar PV 10.150 kW | 16 - 04 - A |